KDOT PMS Replacement Project

R-PMS System Use Cases : Model

System - R-PMS System - Q3 link

Properties
Name Value
Abstract false
Leaf false
Root false

Children
Name Description
 T07-01 Finish NOS collection / processing / reporting : Use Case

This task is to finish the NOS collection processes that was started earlier and get the data processed and reported as data files (CSV and XML)

 T07-03 Generate and load aggregated segment data : Use Case

This is a modeling process in which segment data is used to generate segment based IRI, Rutting, Faulting, and TCR Indexes.

 T07-06 Generate PCCP reports : Use Case

Determine if there are any necessary PCCP reports to be generated.and complete them during this stage of modeling.

 T07-07 Calculate Condition States : Use Case

A modeling stage in which the Pavement Condition States are calculated.

 T07-08 Check for "Widows" and/or "Orphans" : Use Case

This stage determine if there are time widows and/or orphan windows that are available for activities.

For the current year, for every GEOM record there should be a corresponding ROUGH record

For the current year for every GEOM record that is Asphalt pavement type there should be an FDIST record

For the current year for every GEOM record that is Concrete pavement type there should be an RDIST record

...

Also check the other direction that there are not any records in ROUGH that do not have a corresponding GEOM

...

 T07-09 Support Planning with non-Interstate issues : Use Case

Work with Planning to determine if there are any non-internal issues from prior years data collection that need to be addressed at this time.

 T07-11 Support TAMP Reporting : Use Case

Start the initial development of the Transportation Asset Management Plan

 T07-12 Support ACFR Reporting : Use Case

Start the initial development of the Agency Central Financial Report (ACFR) for the State of Kansas

 T07-13 Support Auditor Activities : Use Case

Start the process of making data available to the KDOT Auditor division for evaluation.

 T08-01 Generate condition "reports" and "maps" : Use Case

Generate TAMP, PM (KDOT), IKE, and District reports

 T07-02 Generate and load frame-based HPMS data (State + HPMS) : Use Case

To prepare data for Planning and for NCViewer application

 

This Use Case is also used to generate the planning view for the nonState data.into the PMS.LCMSFrameHPMSnon data table

 T07-04 Validate reasons for missing data elements : Use Case

This modeling step is used to verify that there is no missing data due to construction work and to convert that data into FILL values in the DB tables.

 T07-05 Calculate Distress States & Performance Levels : Use Case

This stage of modeling does a calculation of the Distress State Vector and the Performance Levels of the KHS.The historical method is defined but the method for the R-PMS system needs updated algorithmic definition.

 T07-10 Support GASB Report : Use Case

Support the initial development of the Government Accounting Standards Boards reports for Prior Year Network

 

REq: Performance Measures

 T08-02 Run PMS for 1R Candidates : Use Case

Do the full modeling activities for the 1R processes.

- See AECOM epmsHelpPart20220119100157200 for more information

 T08-03 Prepare 1R Lists for Districts : Use Case

Prepare the 1R candidate lists for initial review by the District Managers

        Candidate Project Lists of recommended actions

        Districts Mileage Allotments

 T08-04 Let Planning know frame-based data is available : Use Case

Make the Frame Based data available to Planning for further utilization in 3R activities

 T09-03 Save Priority Formula data to Planning : Use Case

Calculate the Performance Factors data and send that data to Planning

 T09-02 Calculate Remaining Life : Use Case

Modeling activity in which the Remaining Life of each 1/200th mile segment is calculated for the entire KHS Network.

 T09-01 Track completed and planned projects : Use Case

Work with the Planning WinCPMS system and the candidate lists from the previous year efforts for the current year scheduled work and track the current status of the work and update Planning with the information

 T08-05 Start SKID Data Collection : Use Case

Start the collection of the SKID data regarding the friction coefficients of the road surfaces under optimum dry conditions.

 T08-06 Start FWD Data Collection : Use Case

Start the collection of the FWD data regarding the friction coefficients of the road surfaces under optimum dry conditions.

 T09-04 Modify Mapping due to GIS changes : Use Case

Determine if there are any changes to the Network due to GIS mapping related problems and/or changes.

Appears In
Diagram
 R-PMS Use Cases - Q3 : Use Case Diagram
KDOT PMS Replacement Project