R-PMS System Use Cases : Model
System - R-PMS System - Q3 link
Properties |
Name | Value | ||
Abstract | false | ||
Leaf | false | ||
Root | false |
Children |
Name | Description | ||
|
This task is to finish the NOS collection processes that was started earlier and get the data processed and reported as data files (CSV and XML) |
||
|
This is a modeling process in which segment data is used to generate segment based IRI, Rutting, Faulting, and TCR Indexes. |
||
|
Determine if there are any necessary PCCP reports to be generated.and complete them during this stage of modeling. |
||
|
A modeling stage in which the Pavement Condition States are calculated. |
||
|
This stage determine if there are time widows and/or orphan windows that are available for activities. For the current year, for every GEOM record there should be a corresponding ROUGH record For the current year for every GEOM record that is Asphalt pavement type there should be an FDIST record For the current year for every GEOM record that is Concrete pavement type there should be an RDIST record ... Also check the other direction that there are not any records in ROUGH that do not have a corresponding GEOM ... |
||
|
Work with Planning to determine if there are any non-internal issues from prior years data collection that need to be addressed at this time. |
||
|
Start the initial development of the Transportation Asset Management Plan |
||
|
Start the initial development of the Agency Central Financial Report (ACFR) for the State of Kansas |
||
|
Start the process of making data available to the KDOT Auditor division for evaluation. |
||
|
Generate TAMP, PM (KDOT), IKE, and District reports |
||
|
To prepare data for Planning and for NCViewer application
This Use Case is also used to generate the planning view for the nonState data.into the PMS.LCMSFrameHPMSnon data table |
||
|
This modeling step is used to verify that there is no missing data due to construction work and to convert that data into FILL values in the DB tables. |
||
|
This stage of modeling does a calculation of the Distress State Vector and the Performance Levels of the KHS.The historical method is defined but the method for the R-PMS system needs updated algorithmic definition. |
||
|
Support the initial development of the Government Accounting Standards Boards reports for Prior Year Network
REq: Performance Measures |
||
|
Do the full modeling activities for the 1R processes. - See AECOM epmsHelpPart20220119100157200 for more information |
||
|
Prepare the 1R candidate lists for initial review by the District Managers Candidate Project Lists of recommended actions Districts Mileage Allotments |
||
|
Make the Frame Based data available to Planning for further utilization in 3R activities |
||
|
Calculate the Performance Factors data and send that data to Planning |
||
|
Modeling activity in which the Remaining Life of each 1/200th mile segment is calculated for the entire KHS Network. |
||
|
Work with the Planning WinCPMS system and the candidate lists from the previous year efforts for the current year scheduled work and track the current status of the work and update Planning with the information |
||
|
Start the collection of the SKID data regarding the friction coefficients of the road surfaces under optimum dry conditions. |
||
|
Start the collection of the FWD data regarding the friction coefficients of the road surfaces under optimum dry conditions. |
||
|
Determine if there are any changes to the Network due to GIS mapping related problems and/or changes. |