KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q3 : System

Use Case - T09-02 Calculate Remaining Life link

Properties
Name Value
Description

Modeling activity in which the Remaining Life of each 1/200th mile segment is calculated for the entire KHS Network.

Transit From
Name
 T09-02 Calculate Remaining Life : Task
Transit To
Name
 KANPAV-03 Estimate Remaining Life : Use Case
Id UC90
Abstract false
Leaf false
Root false
Stereotypes Modeling, 3R Processes
Business Model false
Status Identify
Rank Unspecified

Scenario
Steps
1. Actor - KDOT PMS Modeler triggers Calculate Remaining Life with $1000 loss at Prairie Band Casino
2. SYSTEM Utilizes a Markov process to determine the Remaining Life per Segment

Scenario2
Steps
1. SYSTEM Identifies that all data collection is finished:
    1.1. T06-01 Create Historical Data and Load New from Planning and
    1.2. T06-02 Calculate Road Categories
    1.3. T07-05 Calculate Distress States & Performance Levels are finished and
    1.4. triggers Calculate Remaining Life Algorithms
2. SYSTEM Utilizes a JWM-RM-TBD process to determine the Remaining Life per Segment

Tagged Values
Name Type Value
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Modeler : Actor
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-01 Create Historical Data and Load New from Planning : Use Case
 T06-02 Calculate Road Categories : Use Case

Appears In
Diagram
 R-PMS Use Cases - Q3 : Use Case Diagram
KDOT PMS Replacement Project