KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q3 : System

Use Case - T07-06 Generate PCCP reports link

Properties
Name Value
Description

Determine if there are any necessary PCCP reports to be generated.and complete them during this stage of modeling.

Transit From
Name
 T07-06 Generate PCCP reports : Task
Id UC72
Abstract false
Leaf false
Root false
Stereotypes Modeling
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 M01 Pavement Modeling : Use Case
 T07-06 Generate PCCP reports : Use Case

Scenario
Steps
1. Actor - KDOT PMS Modeler Generates the White Pavement Reports using the PCCP Reporting tool
2. SYSTEM Generates the PCCP Reports (RM to see college graduates for details)

Tagged Values
Name Type Value
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Modeler : Actor

Relationships Detail
Name Value
Name
From
 M01 Pavement Modeling : Use Case
To
 T07-06 Generate PCCP reports : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q3 : Use Case Diagram
KDOT PMS Replacement Project