KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q3 : System

Use Case - T07-10 Support GASB Report link

Properties
Name Value
Description

Support the initial development of the Government Accounting Standards Boards reports for Prior Year Network

 

REq: Performance Measures

Transit From
Name
 T07-10 Support GASB Report : Task
Id UC76
Abstract false
Leaf false
Root false
Stereotypes 3R Processes
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 M01 Pavement Modeling : Use Case
 T07-10 Support GASB Report : Use Case

PMS Current
Steps
1. Actor - KDOT PMS Operator Generates GASB related reports
2. SYSTEM responds to query data
3. Actor - KDOT PMS Operator Generates report using provided Format:
    3.1. Percent above minimum conditions - modeled
    3.2. Percent above minimum conditions - measured
    3.3. Minimum acceptable condition Level
    3.4. for both Interstate and non-Interstate
4. NOTE: Costs are generated through other processes external to PMS

R-PMS Desired
Steps
1. Actor - KDOT PMS Operator Triggers GASB Report Generator
2. SYSTEM Generates report using:
    2.1. Percent above minimum conditions - modeled
    2.2. Percent above minimum conditions - measured
    2.3. Minimum acceptable condition Level
    2.4. for both Interstate and non-Interstate
3. NOTE: Costs are generated through other processes external to PMS

Tagged Values
Name Type Value
Level Ad Hoc Enumeration User
Complexity Ad Hoc Enumeration Low
Use Case Status Ad Hoc Enumeration Initial
Implementation Status Ad Hoc Enumeration Started
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text Rick Miller and Jerry W. Manweiler, Ph.D.
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Operator : Actor

Relationships Detail
Name Value
Name
From
 M01 Pavement Modeling : Use Case
To
 T07-10 Support GASB Report : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q3 : Use Case Diagram
KDOT PMS Replacement Project