KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q3 : System

Use Case - T08-02 Run PMS for 1R Candidates link

Properties
Name Value
Description

Do the full modeling activities for the 1R processes.

- See AECOM epmsHelpPart20220119100157200 for more information

Transit From
Name
 T08--02 Run PMS for 1R Candidates : Task
Id UC81
Abstract false
Leaf false
Root false
Stereotypes 1R Processes
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 M01 Pavement Modeling : Use Case
 T08-02 Run PMS for 1R Candidates : Use Case

PMS Current
Steps
1. Actor - KDOT PMS Modeler Executes the AECom modeling procedures
2. SYSTEM Executes the AECom modeling based upon the input parameter space
3. Actor - KDOT PMS Modeler refines input parameters for modeling until feasible/acceptable solutions are acquired
4. SYSTEM Executes the AECom modeling based upon the input parameter space
    4.1. Convert Optimized Projects by Road Category Scopes into Projects by Project Scopes
    4.2. Generates modeling output data for use in T10-5 (list of project locations and scopes w/ year recommendations (2,3,4))
    4.3. JWM - See Powerpoint for data elements generated

R-PMS Desired Opt A
Steps
1. Actor - KDOT PMS Modeler Multiple Iterations of the KanPav modeling procedures
    1.1. SYSTEM Executes the KanPav/Genetic modeling and measures based upon the input parameter space
        1.1.1. Alternative data items used in modeling include:
            1.1.1.1. Federal Surface Condition definitions
            1.1.1.2. Transverse Cracking
            1.1.1.3. Joint Distress
        1.1.2. Alternative models for the above three elements with a baseline of AECom
            1.1.2.1. Genetic Machine Learning Algorithm
            1.1.2.2. TBD Algorithm
        1.1.3. Alternative Action Groups
            1.1.3.1. Actions with respect to Light, Medium, Heavy
            1.1.3.2. Actions with respect to Cost
        1.1.4. Triggers for Actions
            1.1.4.1. Time and/or condition based
    1.2. Generates Overall Network Condition and Cost with breakout of Interstate and non-Interstate
    1.3. Does not generate Candidate Project List (CPL)

R-PMS Desired Opt B
Steps
1. Actor - KDOT PMS Modeler Multiple Iterations of the KanPav modeling procedures
    1.1. SYSTEM Executes the KanPav/SimPav modeling and measures based upon the input parameter space
        1.1.1. Any Sufficiently advanced technology is indistinguishable from magic
        1.1.2. JWM
        1.1.3. Utilization of all historical data per segment per project as a simulation of the Kansas Highway Network
        1.1.4. Solving the PDE's recognizing the district and local dependencies
    1.2. Generates Overall Network Condition and Cost with breakout of Interstate and non-Interstate
    1.3. Generates Candidate Project List (CPL)

R-PMS Opt C
Steps
1. Vender defined Trigger based selection for Candidate Project List generation

Tagged Values
Name Type Value
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Modeler : Actor

Relationships Detail
Name Value
Name
From
 M01 Pavement Modeling : Use Case
To
 T08-02 Run PMS for 1R Candidates : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q3 : Use Case Diagram
KDOT PMS Replacement Project