KDOT PMS Replacement Project

R-PMS System Use Cases : Model . KDOT-PMS Use Cases by Date : Pool

Task - T03-04 Start loading TCR data link

Properties
Name Value
Description

This task is somewhat similar to the Mar03 task in that the PMS Operator takes the Mandli XML data files and extracts the measure of Transverse Cracking for each 1/200th of a mile segment. Then the PMS operator generates a TCM report/data files for use during modeling.

Transit From
Name
 Generate Reports (Mandli) : Task
 Interface or ingest historic pavement condition data : Requirement
 KDOT Historic Pavement Condition Data Integration : Requirement
 Pavement Condition Collection Systems and Data Integration : Requirement
 Interface or ingest historic Mean Texture Depth data : Requirement
Transit To
Name
 T03-04 Start loading TCR data : Use Case
Id BP220.BP238
Start Quantity 1
Completion Quantity 1
Suppress Join Failure false
Enable Instance Compensation false
Process Type None
Status None
Compensation false

Procedure
Steps
1. null

Relationships Summary
Name Begin End
  : Sequence Flow
 T03-04 Start loading TCR data : Task
 T03-05 NCV Loading : Task
  : Sequence Flow
 T03-03 Start loading data from LCMS to RV Workstation : Task
 T03-04 Start loading TCR data : Task

Relationships Detail
Name Value
Name
From
 T03-04 Start loading TCR data : Task
To
 T03-05 NCV Loading : Task
Id BP220.BP241
Condition Type None
Immediate Unspecified
Quantity 1
Timeout 0

Name Value
Name
From
 T03-03 Start loading data from LCMS to RV Workstation : Task
To
 T03-04 Start loading TCR data : Task
Id BP220.BP239
Condition Type None
Immediate Unspecified
Quantity 1
Timeout 0

Appears In
Diagram
 R-PMS System - KDOT-PMS Business Processes by Date : Business Process Diagram
KDOT PMS Replacement Project