KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q1 : System

Use Case - T02-01 Get data collection systems (NOS + JD) ready link

Properties
Name Value
Transit From
Name
 T02-01 Get data collection systems (NOS + JD) ready : Task
Id UC20
Abstract false
Leaf false
Root false
Stereotypes UseCase, PMS Activity
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 T00-00 1R Primary Use Case : Use Case
 T02-01 Get data collection systems (NOS + JD) ready : Use Case

Scenario
Steps
1. Actor - KDOT PMS Operator Makes sure NOS and SD Vans are ready with appropriate Maps
    1.1. Gather FDCL and App for White Pavement along with Maps
    1.2. Maps are generated with ***MAGIC (TBD) *** by System (see Jan07 map generation)

Details
Name Value
Level
Complexity
Use Case Status
Implementation Status
Preconditions
Post-conditions
Author
Assumptions

Tagged Values
Name Type Value
Level Ad Hoc Enumeration Summary
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Operator : Actor

Relationships Detail
Name Value
Name
From
 T00-00 1R Primary Use Case : Use Case
To
 T02-01 Get data collection systems (NOS + JD) ready : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q1 : Use Case Diagram
KDOT PMS Replacement Project