KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - EPMS/KANPAV : System

Use Case - KANPAV-00 1R PMS Prediction System link

Properties
Name Value
Description

Overall Use Case that is used to generate the 1R priority list for each district

Transit From
Name
 M01 Pavement Modeling : Use Case
 PMS Modeling Processes : Choreography Sub-Process
 Start Modeling : Initial Node
 M01 Pavement Modeling : Use Case
 M01 Pavement Modeling : Use Case
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Id UC31
Abstract false
Leaf false
Root false
Stereotypes UseCase, Modeling
Justification Modeling of the pavement system is a necessary step in the 1R process
Business Model false
Primary Actors Actor - KDOT PMS Modeler
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Association
 Actor - KDOT PMS Modeler : Actor
 KANPAV-00 1R PMS Prediction System : Use Case
  : Include
 KANPAV-00 1R PMS Prediction System : Use Case
 KANPAV-04 Lock Data per Date : Use Case
  : Include
 KANPAV-00 1R PMS Prediction System : Use Case
 KANPAV-03 Estimate Remaining Life : Use Case
  : Include
 KANPAV-00 1R PMS Prediction System : Use Case
 KANPAV-02 Calculate Federal Distress State Vector : Use Case
  : Include
 KANPAV-00 1R PMS Prediction System : Use Case
 KANPAV-06 Normalize Highway Segment Data : Use Case

Use Case Note
Inputs or Prior Activities
     KHS Network Segments Data
     Traffic Data
     Road Category Specifications
     Distress State Specifications
     Past Action Data
     Scheduled Work Data
     Auxiliary PMS Data elements
Actions
     Include the following Use Cases
         Lock Data per Actor supplied Date
         Calculate Discrete Condition State per segment
         ...
Outputs
     Recommendation list per district
     Segment State Vector for Priority Formula Calculation
     Segment State Vector for ...
     Segment State Vector for ...
     Segment State Vector for ...
Follow-up
     // Write down the items that should follow-up in the coming meeting
    

Actions
Steps
1. Actor - KDOT PMS Modeler identifies date and segments to model
2. SYSTEM Include the following Use Cases
    2.1. Lock Data per Actor supplied Date
    2.2. Calculate Category Type per segment
    2.3. Calculate Distress State per segment
    2.4. Calculate Remaining Life per segment
    2.5. ...

Details
Name Value
Level Summary
Complexity High
Use Case Status Initial
Implementation Status Scheduled
Preconditions
Post-conditions
Author Rick Miller and Jerry W. Manweiler, Ph.D.
Assumptions

Tagged Values
Name Type Value
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Modeler : Actor

Relationships Detail
Name Value
Name
From
Name Value
Role
Element
 Actor - KDOT PMS Modeler : Actor
Multiplicity Unspecified
Aggregation Kind None
Navigable true
To
Name Value
Role
Element
 KANPAV-00 1R PMS Prediction System : Use Case
Multiplicity Unspecified
Aggregation Kind None
Navigable true
Transit From
Name
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Abstract false
Final Specialization false
Leaf false
Visibility Unspecified
Derived false

Name Value
Name
From
 KANPAV-00 1R PMS Prediction System : Use Case
To
 KANPAV-04 Lock Data per Date : Use Case
Transit From
Name
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Visibility Unspecified
Stereotypes Include

Name Value
Name
From
 KANPAV-00 1R PMS Prediction System : Use Case
To
 KANPAV-03 Estimate Remaining Life : Use Case
Transit From
Name
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Visibility Unspecified
Stereotypes Include

Name Value
Name
From
 KANPAV-00 1R PMS Prediction System : Use Case
To
 KANPAV-02 Calculate Federal Distress State Vector : Use Case
Transit From
Name
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Visibility Unspecified
Stereotypes Include

Name Value
Name
From
 KANPAV-00 1R PMS Prediction System : Use Case
To
 KANPAV-06 Normalize Highway Segment Data : Use Case
Transit From
Name
 T07-05 Calculate Distress States & Performance Levels : Use Case
 T06-02 Calculate Road Categories : Task
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - EPMS - KANPAV Modeling : Use Case Diagram
KDOT PMS Replacement Project