KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q4 : System

Use Case - T12-01 Non-state HPMS Samples received from Planning link

Properties
Name Value
Description

Acquire the non-State HPMS Samples from Planning and handle appropriately

Transit From
Name
 T12-01 Non-state HPMS Samples received from Planning : Task
Id UC91
Abstract false
Leaf false
Root false
Stereotypes 3R Processes
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 T00-00 1R Primary Use Case : Use Case
 T12-01 Non-state HPMS Samples received from Planning : Use Case

Scenario
Steps
1. Actor - KDOT Planning Submits HPMS sample spreadsheet of locations to Actor - KDOT PMS Operator
2. Actor - KDOT PMS Operator looks for changes from prior years and implements each location by
    2.1. Adding to the Route List (Session File (fkLRS), MPbeg, MPend)
    2.2. Modifying the MPbeg / MPend of each route as needed
    2.3. Route List is in Mandli formatted text list which is used in the NOS system for collection
3. SYSTEM Watches patiently

Tagged Values
Name Type Value
Level Ad Hoc Enumeration
Complexity Ad Hoc Enumeration
Use Case Status Ad Hoc Enumeration
Implementation Status Ad Hoc Enumeration
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Operator : Actor
 Actor - KDOT Planning : Actor

Relationships Detail
Name Value
Name
From
 T00-00 1R Primary Use Case : Use Case
To
 T12-01 Non-state HPMS Samples received from Planning : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q4 : Use Case Diagram
KDOT PMS Replacement Project