KDOT PMS Replacement Project

R-PMS Requirements : Package . KDOT Historic Pavement Condition Data Integration : Requirement

Requirement - Interface or ingest GPS data tied to the collection process and LRS. link

Properties
Name Value
Description The solution must interface or incorporate a data conversion process for GPS data that is tied to the data collection process and LRS. Some of this data is currently in the pmis.gps table and is from 1998-2012 at about 700,000 records per year and 26 fields. For 2013-2022, the data is about 2.5million records per year but only 7 fields.
Transit To
Name
 T07-01 Finish NOS collection / processing / reporting : Task
 Match Reference Systems : Sub-Process
 Generate Reports (Mandli) : Task
Id R-PMS 8.5
Stereotypes Data Interface Specification

Attributes
Name Type Value
Text HTML The solution must interface or incorporate a data conversion process for GPS data that is tied to the data collection process and LRS. Some of this data is currently in the pmis.gps table and is from 1998-2012 at about 700,000 records per year and 26 fields. For 2013-2022, the data is about 2.5million records per year but only 7 fields.
ID Text R-PMS 8.5
Source Text
Kind Ad Hoc Enumeration Functional
VerifyMethod Ad Hoc Enumeration Analysis
Risk Ad Hoc Enumeration High
Tag Multi-line Text
Direction Ad Hoc Enumeration

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram
KDOT PMS Replacement Project