KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q4 : System

Use Case - T10-05 Determine 1R project candidate locations and scopes link

Properties
Name Value
Description

Generate an initial 1R project candidate list with respect to locations and scopes.

Transit From
Name
 T10-05 Determine 1R project candidate locations and scopes : Task
Id UC92
Abstract false
Leaf false
Root false
Stereotypes 1R Processes
Business Model false
Status Identify
Rank Unspecified

Relationships Summary
Name Begin End
  : Include
 M01 Pavement Modeling : Use Case
 T10-05 Determine 1R project candidate locations and scopes : Use Case

Scenario
Steps
1. Actor - KDOT PMS Modeler executes the Propagation process:
2. SYSTEM extracts the data output from T08-02 activities
    2.1. Transition Probability Matrices (TRMX) file,
    2.2. Mathematical Programming System (MPS) card,
    2.3. Project Segments,
    2.4. Condition Data per Segment
3. SYSTEM Propagate the policy using all of the above inputs through years 2, 3, and 4
4. SYSTEM Derive Candidate Project List per District
5. Actor - KDOT PMS Modeler presents Candidate Project List for approval through KDOT
6. PPDC/Chief of Construction and Materials distributes the CPL to District Engineers
    6.1. See example Candidate Project List example from Rick
    6.2. See T11-02 for execution

Tagged Values
Name Type Value
Level Ad Hoc Enumeration User
Complexity Ad Hoc Enumeration Medium
Use Case Status Ad Hoc Enumeration Initial
Implementation Status Ad Hoc Enumeration Scheduled
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Modeler : Actor

Relationships Detail
Name Value
Name
From
 M01 Pavement Modeling : Use Case
To
 T10-05 Determine 1R project candidate locations and scopes : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q4 : Use Case Diagram
KDOT PMS Replacement Project