KDOT PMS Replacement Project

R-PMS System Use Cases : Model . R-PMS System - Q1 : System

Use Case - T03-02 Verify data collection processes link

Properties
Name Value
Description

In this stage of the PMS work, it is necessary to verify that the data collection data analysis processes are progressing as expected and to handle any anomalies that might occur.

 

Note: The Alternate R-PMS Desired if implemented would replace all of the Mar03 Activities

Transit From
Name
 T03-02 Verify data collection processes : Task
Id UC54
Abstract false
Leaf false
Root false
Stereotypes PMS Activity, UseCase
Business Model false
Status Identify
Rank High

Relationships Summary
Name Begin End
  : Include
 T03-01 Start Mandli Conflation Activities : Use Case
 T03-02 Verify data collection processes : Use Case

PMS Current
Steps
1. Actor - KDOT PMS Operator
    1.1. Bring in data from Van
    1.2. Copy data from Processing System
    1.3. Run data through Pavemetrics Analysis Tools generating XML Data files for output
2. Pavemetrics Analysis Tools
    2.1. Generate XML data files
3. Actor - KDOT PMS OperatorPass data to Network Production Server for loading into RoadView Workstation (Mandli system)

R-PMS Desired
Steps
1. Actor - KDOT PMS Operator
    1.1. Bring in data from Van
    1.2. Copy data from Processing System
    1.3. Run data through Pavemetrics Analysis Tools generating XML Data files for output
2. Pavemetrics Analysis Tools
    2.1. Generate XML data files
3. SYSTEM Executes interface into Pavemetrics Analysis Workstation ingesting XML Data files

Details
Name Value
Level Subfunction
Complexity High
Use Case Status Initial
Implementation Status
Preconditions
Post-conditions
Author Rick Miller and Jerry W. Manweiler, Ph.D.
Assumptions

Tagged Values
Name Type Value
Level Ad Hoc Enumeration Summary
Complexity Ad Hoc Enumeration High
Use Case Status Ad Hoc Enumeration Initial
Preconditions Multi-line Text
Post-conditions Multi-line Text
Author Text
Assumptions Multi-line Text

References
File Name Description
 Actor - KDOT PMS Operator : Actor

Relationships Detail
Name Value
Name
From
 T03-01 Start Mandli Conflation Activities : Use Case
To
 T03-02 Verify data collection processes : Use Case
Visibility Unspecified
Stereotypes Include

Appears In
Diagram
 R-PMS Use Cases - Q1 : Use Case Diagram
KDOT PMS Replacement Project