KDOT PMS Replacement Project

R-PMS Requirements : Package . Pavement Condition Collection Systems and Data Integration : Requirement

Requirement - Interface with KDOT (or other commercial) pavement condition image viewing and reporting systems link

Properties
Name Value
Description

The solution shall preserve the existing functionality of the interface between the PMS and NCV. This interface sends PMS pavement image and condition (video log with pavement data) and all the necessary data to feed it that currently comes from stored images and many tables of data to NCV.

Transit To
Name
 T01-05 Help with 1R Tours: NCV, Data, Maps : Task
 T07-06 Generate PCCP reports : Task
 T07-10 Support GASB Report : Task
 T07-11 Support TAMP Reporting : Task
 T08-01 Generate condition "reports" and "maps" : Task
 T09-04 Modify Mapping due to GIS changes : Task
 T12-03 FWD job planning and maps : Task
 GIS Integration : Choreography Task
 DA400 Reporting : Sub-Process
 GASB 34 Reporting : Sub-Process
 Generate Reports (Mandli) : Task
Id R-PMS 9.2
Stereotypes PCC System Interface

Attributes
Name Type Value
Text Text
ID Text R-PMS 9.2
Source Text
Kind Ad Hoc Enumeration Functional
Model Model Element
Risk Ad Hoc Enumeration High
Verify Method Ad Hoc Enumeration Test
ReqType Ad Hoc Enumeration M-Mandatory

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram
KDOT PMS Replacement Project