R-PMS Requirements : Package . Project Management Systems Integration : Requirement
Requirement - Interface with KDOT project management systems link
Properties |
Name | Value | ||||||||
Description |
The solution is expected to interface with the KDOT project management system (WinCPMS) as the means to incorporate project information (scheduled and let projects, locations, scopes, schedule, costs, and project number) into the system. |
||||||||
Transit To |
|
||||||||
Id | R-PMS 10.1 | ||||||||
Stereotypes | PM Integration |
Attributes |
Name | Type | Value | |||
Text | Text | ||||
ID | Text | R-PMS 10.1 | |||
Source | Text | ||||
Kind | Ad Hoc Enumeration | Group | |||
Model | Model Element | ||||
Risk | Ad Hoc Enumeration | Medium | |||
Verify Method | Ad Hoc Enumeration | Test | |||
ReqType | Ad Hoc Enumeration | E-Expected |