R-PMS Requirements : Package . Pavement Project Selection Processes : Requirement . Provide Data or Interface to Feed the Priority Formula : Requirement
Requirement - Generate Remaining Pavement Life Attribute link
Properties |
Name | Value | ||||||||
Description |
The solution must generate the remaining pavement life based on the pavement condition data, deterioration models, and Priority Formula selected segmentation (the current process is a Monte Carlo Simulation methodology). |
||||||||
Transit To |
|
||||||||
Id | R-PMS 3.3.1 | ||||||||
Stereotypes | PPF - Analysis Req |
Attributes |
Name | Type | Value | |||
Text | Text | ||||
ID | Text | R-PMS 3.3.1 | |||
Source | Text | ||||
Kind | Ad Hoc Enumeration | Functional | |||
Model | Model Element | ||||
Risk | Ad Hoc Enumeration | High | |||
Verify Method | Ad Hoc Enumeration | Demonstration | |||
Tag | Ad Hoc Enumeration | M-Mandatory |
Appears In |
Diagram | |||
|