KDOT PMS Replacement Project

R-PMS Requirements : Package . Pavement Project Selection Processes : Requirement . Provide Data or Interface to Feed the Priority Formula : Requirement

Requirement - Generate Remaining Pavement Life Attribute link

Properties
Name Value
Description

The solution must generate the remaining pavement life based on the pavement condition data, deterioration models, and Priority Formula selected segmentation (the current process is a Monte Carlo Simulation methodology).

Transit To
Name
 T09-02 Calculate Remaining Life : Task
Id R-PMS 3.3.1
Stereotypes PPF - Analysis Req

Attributes
Name Type Value
Text Text
ID Text R-PMS 3.3.1
Source Text
Kind Ad Hoc Enumeration Functional
Model Model Element
Risk Ad Hoc Enumeration High
Verify Method Ad Hoc Enumeration Demonstration
Tag Ad Hoc Enumeration M-Mandatory

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram