KDOT PMS Replacement Project

R-PMS Requirements : Package . KDOT and Federal Pavement Performance Monitoring Processes : Requirement . flow and track predicted pavement condition data for KDOT Performance Measures Dashboard submittals : Requirement

Requirement - run analyses to determine predicted pavement performance measure link

Properties
Name Value
Description

The solution must complete an analysis that processes the inputs like those described under requirements 2 and 3 to generate the predicted pavement condition as defined by KDOT to perform this function annually [note that the "future" conditions in these cases might be only a function of deterioration and already scheduled projects.] and provide that data to the KDOT Performance Measures Dashboard. NOTE: this data pass could be a very simple interface or workflow.

Transit To
Name
 T07-05 Calculate Distress States & Performance Levels : Task
 PMS Modeling Processes : Choreography Sub-Process
 TAMP / Performance Measures Processes : Choreography Task
 Performance Projections : Data Output
 State Specific Performance Measures : Sub-Process
Id R-PMS 4.2.1
Stereotypes PPM - PM Submittal Data Req

Attributes
Name Type Value
Text Text
ID Text R-PMS 4.2.1
Source Text
Kind Ad Hoc Enumeration Functional
Model Model Element
Risk Ad Hoc Enumeration Medium
Verify Method Ad Hoc Enumeration Demonstration
ReqType Ad Hoc Enumeration M-Mandatory

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram
KDOT PMS Replacement Project