KDOT PMS Replacement Project

R-PMS Requirements : Package . Pavement Project Selection Processes : Requirement

Requirement - 3R PPS - Analysis link

Properties
Name Value
Description

The solution must generate candidate projects with scopes for "3R" projects given current pavement conditions, deterioration models, action costs and post action models, constraints on work types (including existing layer factors that influence practical work types and structural evaluation influences), economic assumptions, and desired pavement conditions at specific periods (at least 5 years) including the possibility of variable inputs and output for each year in the analysis. NOTE: The requirements under 2.1.x also apply under 3.2 but now for "3R" Project Recommendation Process.

Transit To
Name
 T09-03 Save Priority Formula data to Planning : Task
 PMS Modeling Processes : Choreography Sub-Process
 3R Comparative Candidate List : Generic Connector
 Priority Formula Processes : Choreography Task
 Modeling for 1R-3R 2-12year horizon : Rectangle
Id R-PMS 3.2
Stereotypes PPS - 3R Analysis

Attributes
Name Type Value
Text Text
ID Text R-PMS 3.2
Source Text
Kind Ad Hoc Enumeration Group
Model Model Element
Risk Ad Hoc Enumeration Medium
Verify Method Ad Hoc Enumeration Demonstration
ReqType Ad Hoc Enumeration M-Mandatory
Priority <> Mandatory

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram
KDOT PMS Replacement Project