KDOT PMS Replacement Project

R-PMS Requirements : Package . KDOT Highway Inventory Systems Integration : Requirement . Interface with KDOT implementation of Roads and Highways called K-Hub : Requirement

Requirement - Use K-Hub Interface to update PMS inventory data link

Properties
Name Value
Description

The solution must preserve the existing functionality of the interface between KDOT's Inventory System (KHUB) and the PMS. This read/write interface allows data to pass from the KHUB to PMS to check/update inventory items (traffic, NHS, maintenance responsibility, pavement type, lane widths, shoulder type, shoulder width, etc.).

Transit To
Name
 T06-01 Create Historical Data and Load New from Planning : Task
Id R-PMS 6.1.2
Stereotypes K-HUB Integration Req

Attributes
Name Type Value
Text Text
ID Text R-PMS 6.1.2
Source Text
Kind Ad Hoc Enumeration Functional
Model Model Element
Risk Ad Hoc Enumeration High
Verify Method Ad Hoc Enumeration Test
ReqType Ad Hoc Enumeration M-Mandatory

Appears In
Diagram
 R-PMS System - Master Requirements for KDOT Replacement PMS System : Requirement Diagram
KDOT PMS Replacement Project