R-PMS System Use Cases : Model
Package - Actors link
Properties |
Name | Value | ||
Description |
Actors used by the R-PMS Use Cases |
||
Abstract | false | ||
Leaf | false | ||
Root | false | ||
Visibility | public |
Children |
Name | Description | ||
|
|||
|
|||
|
|||
|
|||
|
This actor has the responsibility to oversee the KDOT PMS 1R processes throughout the annual 1R lifecycle. |
||
|
This actor represents the KDOT Van operators whom are tasked with the responsibility of driving and scanning the designated highways and collect data from the Mandli hardware. |
||
|
|||
|
|||
|
This actor represents the activities of the Mandli Road View Explorer (RVE) tool which resides outside the scope of the PMS system but is required for data production of Pavement Surface Data reports (files) for which the PMS system is dependent. |
||
|
This actor represents the activities of the Mandli Road View Explorer (RVE) tool which resides outside the scope of the PMS system but is required for data production of Pavement Surface Data reports (files) for which the PMS system is dependent. |